So, the sun is shining this morning & we have an extra body on site (Bones - a guy from Cape Breton who's been with Bamfield for a while & still sounds like he's straight off the rock!!). Today should be shingling day & the start of windows.......
The rest of the day was spent putting up the scaffold at the back of the house to paper & prep the back wall for siding & the installation of the back windows. They might get put in today!! I think we were told that it will take about 2 hours per window for installation - we have 21 windows plus a sliding door.
There are 8 that haven't arrived yet because they were just framed in on th
Again, this is the view from the loft - now framed in for the windows. This wall is such a solidly built wall that nothing is going to move it EVER! All the frames are 2 by 6 - which means the frames are 16 inches thick!!! (there are 8 pieces of wood stacked side-by-side around each window hole & securely held in place with metal strapping) Granted I don't have any space to put my electrical.......but we'll work around that when it comes time for our electrican to come in.
This is the window design for the south wall that Phil drew up once the frames were finished. Yes, it has changed from the original design, but the carpenter felt that this was the best way to keep the wall strong for when the winter storms start blowing.